🅿️ 1. Parking Lot & Array Architecture
🔩 2. Structural Steel & Wind Design
⚡ 3. Integrated EV Charging & Credits
Solar PV Capacity
456 kW-DC
114,000 lbs Steel
Net Turnkey CapEx
$728,400
After -$338k IRA Tax Credits
Annual Stacked Revenue
$88,400/yr
8.2 Yrs Simple Payback
Drilled Shaft Pier Foundation & Civil Bill of Materials 30 Drilled Concrete Piers
Pier Diameter & Depth
36" dia × 14 ft depth
Resists overturning moments
Concrete Volume
110 Cubic Yards
4,000 PSI high-early mix
Steel Weight Ratio
250 lbs / kW
Hot-dip galvanized A992 steel
Turnkey Solar Carport & EV Charging Budget Schedule
| Scope / Line Item | Quantity | Unit Rate | Amount ($) |
|---|
25-Year Cumulative Clean Energy Value
$1,640,000 Net Cash FlowProvides shaded customer parking, EV charging revenue monetization, eliminates parking lot snow removal plowing costs, and protects asphalt pavement from UV degradation.