Geotechnical & Array Parameters Site Profile
500 kW-DC (~1,250 Panels)
100 kW
1.5 MW
5.0 MW
Civil Unit Pricing
$
$
Embedment Depth
8.5 ft (102 in)
✓ +5.5 ft Beyond Frost
Total Piles Driven
156 Piles
~1 Pile per 8 Panels
Overturning Moment
14,280 ft-lbs
Per Foundation Post
Foundation CapEx
$41,847
$0.084 / W-DC
📐 Geotechnical Embedment & Steel Schedule Broms Lateral Analysis
Total Steel Pile Length:
14.0 ft (168 in)
Above-Grade Reveille:
5.5 ft
Underground Embedment:
8.5 ft
Total Galvanized Steel:
10.4 Metric Tons
Driving Rig Production:
2.5 Days (60 piles/day)
Above Ground (5.5 ft)
— Ground Line —
Embedment (8.5 ft)