⭐ EXCLUSIVE TERRITORY RESERVATION Commercial Trade Subcontractor? Lock in your exclusive metro ZIP territory before local competitors claim it.
ToolsVault Trade Directory

Find Verified Commercial Subcontractors

Direct directory of pre-screened specialty trade contractors across major commercial metropolitan corridors.

πŸ›‘οΈ Free Pre-Bid Checklist & Change Order Shield (PDF) πŸ“Š Free Excel Bid Calculator (.XLSX)
πŸ“¦ Estimating Spreadsheets ($29) → ⭐ Claim Territory ($49/mo) → πŸ” Subcontractor Directory →
⚑ Change Order & Stacking Calculator
πŸ“Š Free Resource (2026/2027 Edition) Excel + Sheets

Commercial Subcontractor Material Takeoff & Bid Model (.XLSX)

Download our production-grade CSI MasterFormat bid takeoff model. Includes pre-wired formulas for fully burdened labor rates, overtime multipliers, equipment mobilization depreciation, tiered subcontractor overhead/profit markups, and statutory retainage release schedules.

Instant Free Download ⚑ Over 1,240 contractors downloaded
MasterFormat Need an audit-ready contractor estimating suite?

Download the unlocked General Contractor & MEP CSI Takeoff Suite with Burdened Labor Multipliers (.xlsx).

Unlock Estimating Suite • $29
Standard AIA A401 / AGC Compliant Template

Commercial Trade Master Subcontract Agreement

Commercial Subcontractor Master Agreement

STANDARD SCOPE OF WORK, PAYMENT TERMS & GENERAL CONDITIONS

This Commercial Subcontract Agreement ("Agreement") is entered into as of October 1, 2026, by and between Prime General Contracting Partners LLC ("Contractor") and Commercial Trade Solutions LLC ("Subcontractor").

Section 1: Scope of Work & Performance Standards

Subcontractor shall furnish all labor, materials, equipment, supervision, and tools necessary to complete the specified trade work described in the attached Bid Proposal and Contract Drawings, adhering strictly to CSI MasterFormat specifications, local municipal building codes, and manufacturer installation guidelines. Work shall be performed in a good and workmanlike manner.

Section 2: Contract Sum, Progress Billings & Retainage

Contractor shall pay Subcontractor the agreed Lump Sum Contract Price in monthly progress payments based upon the percentage of work satisfactorily completed, less a standard 10% retainage. Retainage shall be reduced to 5% upon 50% completion, and released in full within thirty (30) days following substantial completion, punch list sign-off, and delivery of final lien waivers.

Section 3: Statutory Prompt Payment

Contractor shall remit progress payments to Subcontractor within seven (7) calendar days of receipt of payment from the Project Owner. Unexcused late payments shall accrue statutory interest per applicable state commercial prompt payment statutes.

Section 4: Changes in Work & Concealed Conditions

No alterations, additions, or deletions shall be executed without an authorized, written Change Order signed by both Contractor and Subcontractor specifying price adjustments and schedule modifications. Subcontractor shall give prompt written notice within forty-eight (48) hours upon discovery of concealed or unforeseen subsurface/structural conditions.

Section 5: Insurance, Indemnification & Safety

Subcontractor shall maintain throughout the duration of the project: (a) Statutory Workers' Compensation Insurance ($1,000,000 limit); (b) Commercial General Liability Insurance ($1,000,000 per occurrence / $2,000,000 aggregate) naming Contractor as Additional Insured on a primary and non-contributory basis; (c) Commercial Auto Liability ($1,000,000 combined single limit). Subcontractor shall strictly comply with all Federal OSHA 30 standards.

Section 6: Warranty & Correction of Work

Subcontractor warrants all workmanship against defects for a period of one (1) full year from the date of substantial completion. Subcontractor shall promptly correct defective workmanship at its sole expense upon written notification by Contractor.

CONTRACTOR: Prime General Contractor
By: Authorized Project Executive | Date: _____________
SUBCONTRACTOR: Trade Partner
By: Managing Member / Officer | Date: _____________
Statutory Construction Legal Instrument

Mechanic's Lien Waiver & Release Generator

Select Waiver Type:

CONDITIONAL WAIVER AND RELEASE ON PROGRESS PAYMENT

NOTICE: THIS DOCUMENT WAIVES AND RELEASES CERTAIN STATUTORY MECHANIC'S LIEN RIGHTS EFFECTIVE UPON RECEIPT OF PAYMENT.

On receipt by the undersigned Claimant of a check in the amount of $28,500.00 payable to Claimant, and when the check has been properly endorsed and has been paid by the bank on which it is drawn, this document becomes effective to release any mechanic's lien right, any right arising from a payment bond, and any claim under a construction invoice for labor, services, equipment, or materials furnished through the Through Date specified below.

CLAIMANT (SUBCONTRACTOR):
Commercial Trade Solutions LLC
State Contractor License #: COMM-948271
CUSTOMER (GENERAL CONTRACTOR):
Prime General Contracting Partners LLC
Contract / PO #: PO-2026-8492
PROJECT & LOCATION:
Regional Commercial Logistics Facility
Address: 1000 Commercial Parkway, Metro Corridor
THROUGH DATE & AMOUNT:
Amount: $28,500.00
Through Date: October 15, 2026
EXCEPTIONS & DISPUTED CLAIMS:
This release does not cover: (1) Standard contract retainage in the amount of $3,150.00; (2) Pending written Change Order Requests #03 and #04 totaling $8,450.00; (3) Disputed claims for additional labor furnished after the Through Date.
CLAIMANT AUTHORIZED SIGNATURE
Printed Name: _____________________ Title: ____________
Execution Date: ____________________
NOTARY PUBLIC ACKNOWLEDGEMENT
State of: ______________ County of: ______________
Sworn to and subscribed before me on this _____ day of ____________, 2026.
Notary Public Signature & Seal
AIA Document G701β„’ Standard Legal Instrument

Construction Change Order Agreement Generator

CHANGE ORDER

Standard Form of Agreement Between Owner / General Contractor and Trade Subcontractor
PROJECT: Commercial Logistics Center Decarbonization
PROJECT ADDRESS: 4500 Trade Corridor Pkwy, Industrial District
ORIGINAL CONTRACT DATE: January 15, 2026
CHANGE ORDER NUMBER: CO-001
DATE OF ISSUANCE: 2026-09-13
PRIME GC / OWNER: Summit Prime Builders LLC
SUBCONTRACTOR: Apex Commercial Mechanical & Energy Systems
1. Description of Change in Work

The Contract is hereby changed and modified as follows (attach detailed subcontractor breakdown, RFI reference, and supplier quotes as Exhibit A):

β€’ Furnish and install 2x additional 480V 3-phase commercial disconnect switches and heavy-gauge seismic snubber vibration isolators on rooftop mechanical pads.
β€’ Reroute 4-inch condenser water supply bypass headers around newly discovered structural steel member per RFI #14.
β€’ Includes 28 hours journeyman pipefitter labor, rigid conduit piping, fittings, certified testing, and commissioning.
2. Contract Sum Adjustment Schedule
Original Contract Sum: $148,000.00
Net change by previously authorized Change Orders: $0.00
The Contract Sum prior to this Change Order was: $148,000.00
The Contract Sum will be INCREASED by this Change Order in the amount of: +$16,450.00
The new Contract Sum including this Change Order will be: $164,450.00
3. Contract Time & Schedule Adjustment
Contract Time adjustment: +5 Calendar Days
New Substantial Completion Date: November 15, 2026

NOTE: This Change Order constitutes full, complete, and final settlement and accord for all direct, indirect, delay, impact, disruption, and overhead costs arising out of or related to the changed work described herein. Upon mutual execution, this document becomes an integral part of the Contract.

AUTHORIZED BY PRIME GC / OWNER
Authorized Signature
Printed Name: Robert Sterling
Title: Senior Project Manager
Date: 2026-09-13
ACCEPTED BY SUBCONTRACTOR
Authorized Signature
Printed Name: David Vance
Title: Managing Principal / Estimator
Date: 2026-09-13
AIA Document G704β„’ Legal Instrument

Certificate of Substantial Completion Generator

CERTIFICATE OF SUBSTANTIAL COMPLETION

AIA Document G704β„’ Form β€’ Establishes Legal Occupancy & 1-Year Warranty Commencement
PROJECT: Summit Industrial Park Clean Energy Retrofit
PROJECT LOCATION: 8200 Trade Corridor Way, Suite 400
CONTRACT DATE: February 10, 2026
SUBSTANTIAL COMPLETION DATE: 2026-09-13
PRIME GC / OWNER: Summit Prime Builders LLC
SUBCONTRACTOR: Apex Commercial Mechanical & Energy Systems
1. Stage of Work & Legal Fitness for Use

The Work performed under this Contract has been reviewed and inspected by the Prime Contractor and Subcontractor and is certified to be substantially complete in accordance with the Contract Documents. The designated Work is sufficiently complete so that the Owner can occupy, operate, and utilize the Work for its fully intended commercial use.

2. Punch List Completion & 1-Year Statutory Warranty
EXHIBIT A β€’ PUNCH LIST ITEMS TO COMPLETE (Within 30 Calendar Days):
β€’ Provide final test and balance (TAB) certified report and commissioning logbook.
β€’ Replace temporary dust pre-filters on rooftop mechanical units with final MERV-13 filters.
β€’ Final labeled identification tags on condenser water return valves and breaker disconnects.

The statutory One-Year Workmanship & Equipment Warranty Period commences on the Date of Substantial Completion established above. The failure to include any item on the punch list does not alter the Subcontractor's obligation to complete all Contract Work.

TRANSFER OF RISK & UTILITIES: As of the Date of Substantial Completion, full responsibility for project security, permanent building heating/cooling, utilities, damage to completed work, and property insurance transfers directly to the Owner / Prime General Contractor.
CONFIRMED BY PRIME GENERAL CONTRACTOR / OWNER
Authorized Signature
Printed Name: Robert Sterling
Title: Project Executive
Date: 2026-09-13
SUBMITTED BY TRADE SUBCONTRACTOR
Authorized Signature
Printed Name: David Vance
Title: Managing Principal
Date: 2026-09-13
Statutory Construction Legal Instrument Suite

Notice of Commencement & 20-Day Preliminary Notice

NOTICE OF FURNISHING & PRELIMINARY 20-DAY STATUTORY LIEN NOTICE

Served Pursuant to State Statutory Mechanic's Lien Laws • Preserves Subcontractor & Material Supplier Payment Rights
TO PROPERTY OWNER:
Owner Name: Pinnacle Commercial Development LLC
Address: 100 Executive Boulevard, Suite 500, Austin, TX 78701
LENDER / FINANCING: First Commercial Construction Bank
TO PRIME GENERAL CONTRACTOR:
General Contractor: Vanguard Builders Group Inc.
Address: 4500 Trade Center Parkway, Austin, TX 78744
SERVICE TRACKING: Certified Mail # 7021 0370 0001 8945 2210
PROJECT NAME / LEGAL PROPERTY: Summit Plaza Logistics & Cold Storage Retrofit
PROJECT STREET ADDRESS: 7400 Industrial Parkway, Building B, Austin, TX 78744
COUNTY & PARCEL ID: Travis County • APN: 03-8492-1049-00

PLEASE TAKE NOTICE that the undersigned trade contractor/material supplier has begun or will begin providing labor, materials, equipment, or services for the improvement of the real property designated above.

DESCRIPTION OF LABOR / SCOPE: Commercial MEP Mechanical • Rooftop Chiller, Variable Speed Pumps, Hydronic Piping & Automation Controls
DATE FIRST FURNISHED: 2026-09-13
ESTIMATED VALUE OF LABOR/MATERIALS: $168,500.00

STATUTORY WARNING: This is NOT a lien, cloud on title, or reflection on the contractor’s credit. It is a statutory notice required by law for the preservation of rights to record a mechanic’s or materialman’s lien in the event of non-payment. If you have questions regarding this notice or require lien waivers with progress billings, contact the undersigned promptly.

CLAIMANT / SUBCONTRACTOR FIRM
Firm Name: Apex Mechanical & Energy Contractors LLC
License Number: HVAC-TACLA-049281E
Phone / Contact: (Your Direct Estimating Line) • estimating@yourcompany.com
Address: 1820 Energy Way, Suite 210, Austin, TX 78704
AUTHORIZED SIGNATURE & AFFIDAVIT OF SERVICE
Authorized Officer / Agent Signature
Printed Name: Marcus Vance, CFO
Date Served: 2026-09-13 via Certified Mail Return Receipt Requested
AIA Document G702β„’ & G703β„’ Billing Suite

Application and Certificate for Payment & Schedule of Values

APPLICATION AND CERTIFICATE FOR PAYMENT

AIA Document G702β„’ Standard Construction Billing Instrument
TO OWNER: Pinnacle Commercial Development LLC
PROJECT: Summit Logistics Innovation Hub
FROM CONTRACTOR: Apex Mechanical & Energy Contractors LLC
ARCHITECT / ENG: Corridor MEP Engineering Consultants
APPLICATION NO: 04
PERIOD TO: 2026-09-14
CONTRACT DATE: January 15, 2026
PROJECT NOS: PRJ-2026-MEP-884
CONTRACTOR'S APPLICATION FOR PAYMENT AMOUNT ($)
1. ORIGINAL CONTRACT SUM $185,000.00
2. Net change by Change Orders (Approved AIA G701) $14,200.00
3. CONTRACT SUM TO DATE (Line 1 ± 2) $199,200.00
4. TOTAL COMPLETED & STORED TO DATE (Column G on G703) $138,400.00
5. RETAINAGE: 10% of Completed Work & Stored Material $13,840.00
6. TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5) $124,560.00
7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) $82,400.00
8. CURRENT PAYMENT DUE (Line 6 less Line 7) $42,160.00
9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) $74,640.00
CONTRACTOR'S SIGNED CERTIFICATION

The undersigned Contractor certifies that to the best of their knowledge, information and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid for Work for which previous Certificates for Payment were issued, and that current payment shown herein is now due.

Authorized Subcontractor Signature • Marcus Vance, CFO
Date: 2026-09-14 • State of TX, County of Travis
ARCHITECT / OWNER'S CERTIFICATE FOR PAYMENT

In accordance with the Contract Documents, based on on-site observations and the data comprising this application, the Architect certifies to the Owner that to the best of the Architect's knowledge the Work has progressed as indicated, the quality of the Work is in accordance with Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED.

AMOUNT CERTIFIED: $42,160.00
Architect / Engineer Signature • Date: 2026-09-14
AIA Document G711β„’ & OSHA Field Compliance

Construction Daily Field Report & Safety Log

SUPERINTENDENT'S DAILY FIELD REPORT & MANPOWER LOG

AIA Document G711β„’ Architect's Field Report & OSHA 300 Recordkeeping Alignment
PROJECT: Summit Logistics Innovation Hub (Phase II)
LOCATION: 7400 Industrial Parkway, Austin, TX 78744
GENERAL CONTRACTOR: Vanguard Builders Group Inc.
SUPERINTENDENT: Tyler Sterling, Project Super (OSHA 30)
REPORT DATE: 2026-09-14
DAILY REPORT NO: LOG-052 • SHIFT: Day (07:00 - 15:30)
WEATHER CONDITIONS: Clear / Sunny • High: 78Β°F / Low: 54Β°F • Wind: 6 mph
SITE IMPACT: Dry / Full Productive Shift • No Weather Delay
1. On-Site Trade Headcount & Manpower Matrix (CSI Divisions)
CSI Trade Division Subcontractor Firm Name Headcount Hrs/Worker Total Hours Primary Scope / Location Today
Div 23 Mechanical Apex Mechanical & Energy Contractors 10 8.0 80.0 Rigged 2x VRF Condensers on Roof; Welded Level 3 chilled water headers
Div 26 Electrical & Solar Lone Star Commercial Electric LLC 12 8.0 96.0 480V 3-phase feeder rough-in to mechanical room; PV inverter conduits
Div 07 Roofing / Envelope Pinnacle Commercial Roofing Group 8 8.0 64.0 60-mil TPO membrane welding around curb penetrations & parapet flashings
Div 03 Concrete & Civil Texan Structural Concrete Solutions 6 8.0 48.0 Poured exterior transformer equipment pads & bollard footing embeds
TOTAL DAILY JOBSITE HEADCOUNT & MAN-HOURS 36 Men - 288.0 Hrs Zero overtime authorized; standard productive shift
2. Heavy Equipment on Site Today
β€’ 1x Grove 80-Ton Hydraulic All-Terrain Crane (Active pick from 08:30 to 12:00)
β€’ 2x JLG 45-ft Articulating Electric Boom Lifts (Active on south wall conduit)
β€’ 1x CAT 10,000-lb Telescopic Telehandler / Rough-Terrain Forklift
β€’ 1x 250 kW Mobile Diesel Generator (Testing switchboard temporary power)
3. Materials & Major Deliveries Received
β€’ Daikin Applied: 2x 50-Ton VRF Outdoor Condensing Units (Inspected OK, no transit damage)
β€’ Ferguson Mechanical: 420 LF 4" Sch 40 Carbon Steel Pipe + Victaulic Couplings
β€’ Carlisle SynTec: 40 rolls 60-mil TPO Membrane + Low-VOC bonding adhesive
β€’ Bills of Lading verified and signed into field staging log.
4. Summary of Work Progress & Building Inspections
PROGRESS NARRATIVE: Mechanical contractor successfully rigged and set both rooftop VRF outdoor condensing units onto pre-installed vibration isolation curbs on Roof Level 4 with zero incidents. Electrical crew completed pulling 500 kcmil copper feeders from main service board MSB-1 up through electrical chase to penthouse disconnects. Roofing crew flashed 6 roof curbs and welded field seams; completed peel tests passed.
MUNICIPAL / 3RD PARTY INSPECTIONS: City of Austin MEP Rough-In Inspector (J. Ramirez) conducted plumbing/mechanical pressure test inspection on hydronic riser line #2 (held 150 PSI for 4 hours). Inspection signed off as PASSED with permit card stamped.
5. OSHA Safety Compliance & Jobsite Hazard Log
TOOLBOX TALK: Critical Crane Pick Rigging & 100% Leading Edge Fall Arrest RECORDABLE INJURIES: ZERO (0) • LOST TIME: ZERO (0)
All rigging cables, synthetic slings, and tag lines inspected prior to morning lift. Exclusion barricades maintained under crane radius. Full PPE, hard hats, safety glasses, and high-vis vests verified for all 36 trade personnel.
GENERAL CONTRACTOR SUPERINTENDENT
Tyler Sterling • Vanguard Builders Group Inc.
Signature on File • Date: 2026-09-14
PROJECT MANAGER / QUALITY CONTROL OFFICER
Marcus Vance, QC Representative • Apex Energy Systems
Verified & Archived • Date: 2026-09-14
AIA Document G716β„’ Construction Instrument

Request for Information (RFI) & Clarification Form

REQUEST FOR INFORMATION (RFI)

AIA Document G716β„’ Formal Clarification of Contract Documents & Field Conditions
PROJECT: Summit Logistics Innovation Hub
TO (ARCHITECT / EOR): Corridor MEP Engineering Consultants
PRIME GENERAL CONTRACTOR: Vanguard Builders Group Inc.
SUBMITTED BY: Apex Mechanical & Energy Contractors LLC
RFI NUMBER: RFI-028
DATE TRANSMITTED: 2026-09-14
DATE RESPONSE REQUIRED: Within 5 Business Days
DISCIPLINE / TRADE: CSI Div 23 • Mechanical Hydronic Piping
SPECIFICATION SECTION: Div 23 21 13 - Hydronic Piping & Valves
DRAWING SHEET & DETAIL: Sheet M-201, Plan Level 3 • Detail 4/S-302
1. Description of Problem, Conflict, or Request for Clarification
At Gridline D-4 on the Level 3 ceiling plenum, structural steel moment framing beam W24x68 conflicts directly with the route of the 4-inch chilled water supply and return piping headers shown on Drawing M-201. The bottom of the structural steel flange is at 10'-2" AFF, leaving insufficient vertical clearance for the 4-inch pipe plus 2-inch closed-cell insulation without violating the 9'-6" architectural finished ceiling height. Please provide approved routing or penetrations.
2. Subcontractor's Recommended Solution / Engineering Proposal
Subcontractor recommends offsetting both 4-inch chilled water lines 18 inches South around beam W24x68 utilizing two (2) 45-degree welded carbon steel long-radius elbows on each line. Hydraulic pressure drop calculations indicate an insignificant increase of 0.12 PSI, well within primary pump head margins. Finished ceiling height is preserved at 9'-6" AFF.
3. Potential Cost & Schedule Impact Assessment
POTENTIAL COST IMPACT: Minor (Estimated <$1,200 for fittings; absorbed if approved promptly)
SCHEDULE IMPACT: Zero (0) Days if response received by required date
4. Architect / Engineer of Record (EOR) Official Written Response
RESPONSE FROM EOR: Subcontractor's proposed 18-inch southern offset with 45-degree LR welded elbows is APPROVED AS NOTED. Contractor must maintain a minimum 1.5-inch clear air gap between pipe insulation jacket and adjacent fireproofing on beam W24x68. Ensure pipe roller hangers are placed within 12 inches of each elbow. No change to contract sum or completion date.
REQUESTED BY (SUBCONTRACTOR / GC)
Signature • Marcus Vance, Project Engineer
Date Submitted: 2026-09-14
RESPONSE AUTHORIZED BY (ARCHITECT / EOR)
Signature • David Chen, P.E., Lead Mechanical Engineer
Date Responded: 2026-09-14
OSHA Form 301 Compliant Instrument

Injury & Illness Incident Report & Near-Miss Log

OSHA FORM 301: INJURY AND ILLNESS INCIDENT REPORT

U.S. Department of Labor • Occupational Safety & Health Administration • 29 CFR 1904
EMPLOYER / SUBCONTRACTOR: Apex Mechanical & Energy Contractors LLC
ESTABLISHMENT NAME: Summit Logistics Innovation Hub Jobsite
PROJECT ADDRESS: 7400 Industrial Parkway, Austin, TX 78744
WORKERS' COMP CARRIER: Texas Mutual Insurance • Policy #WC-849201-26
CASE / INCIDENT NO: CASE-2026-03
INCIDENT CLASSIFICATION: NEAR-MISS / FIRST AID ONLY
DATE OF REPORT: 2026-09-14
TIME OF INCIDENT: 10:45 AM • SHIFT: Day Shift
1. Employee / Involved Worker Information
Full Name: David Ramos
Job Title: Journeyman Pipefitter
Date of Hire: 03/15/2026
Date of Birth: 11/04/1988
Sex: Male
Employee Status: Regular Full-Time
2. Healthcare Professional & Medical Treatment
TREATING PHYSICIAN / CLINIC:
Dr. Kevin Sterling, MD • Concentra Urgent Care
4201 S Congress Ave, Austin, TX 78745
TREATED IN EMERGENCY ROOM? No (Evaluated at Occupational Clinic)
HOSPITALIZED OVERNIGHT AS INPATIENT? No (Released same day to full duty)
3. Incident Chronology & Description of What Happened
LOCATION ON JOBSITE: Level 3 Mechanical Penthouse, Northwest Header Chase (Gridline D-4).
WHAT WAS EMPLOYEE DOING JUST BEFORE THE INCIDENT? Worker was guiding a 4-inch Schedule 40 carbon steel pipe section into an overhead clevis hanger while standing on a locked mobile rolling scaffold (platform height 6'-0").
WHAT HAPPENED? (DETAILED SEQUENCE): As the pipe was being aligned, a temporary chain hoist rigging clamp slipped 2 inches on the structural beam flange, causing the pipe end to lurch downward approximately 8 inches. Worker braced against the movement with his right forearm. While the pipe remained captured by the safety sling preventing a total drop (Zero fall to deck), the worker sustained a minor contusion to the right forearm from contact with the scaffold guardrail.
INJURY / ILLNESS SUSTAINED: Superficial contusion/bruise to right forearm. Cleared by clinic with zero fractures, zero stitches. Prescribed ice pack and return to full duty.
4. Root-Cause Investigation & Corrective Actions (CAPA)
ROOT CAUSE: The beam clamp used was not tightened to manufacturer-specified torque for the tapered flange profile of beam W24x68, allowing slight slippage under dynamic lateral rigging weight.
CORRECTIVE & PREVENTIVE ACTIONS TAKEN:
1. Immediate safety stand-down held with all mechanical and rigging personnel at 11:30 AM today.
2. Mandated positive mechanical locking beam clamps with safety locking pins for all overhead pipe hoisting operations.
3. Pre-lift inspection checklist updated to require torque verification on all temporary rigging attachments prior to load transfer.
OSHA 300 LOG RECORDABLE? NO • First Aid Only / Near-Miss Protocol (No Lost Days, No Restrictions)
DAYS AWAY FROM WORK: 0 Days
PREPARED BY (SAFETY MANAGER / SUPERINTENDENT)
Signature • Marcus Vance, Corporate Safety Director (CSP)
Date Completed: 2026-09-14
EXECUTIVE REVIEW & CLOSURE
Signature • Tyler Sterling, Project Executive
Archived for 5-Year OSHA Record Retention • Date: 2026-09-14
ACORD 25 (2016/03) Standard Instrument Certificate of Commercial Liability Insurance & Endorsement Audit
ACORDβ„’ CERTIFICATE OF LIABILITY INSURANCE
DATE (MM/DD/YYYY): 09/14/2026
PRODUCER / BROKERAGE:
Aon Risk Insurance Services West, Inc.
2001 Ross Avenue, Suite 3800, Dallas, TX 75201
Contact: (Direct Surety Broker) | Phone: (Your Direct Estimating Line) | Email: estimating@yourcompany.com
INSURERS AFFORDING COVERAGE:
INSURER A: Travelers Property Casualty Co of America (NAIC 25674)
INSURER B: Liberty Mutual Insurance Company (NAIC 23043)
INSURER C: Zurich American Insurance Company (NAIC 16535)
INSURER D: Texas Mutual Insurance Company (NAIC 22945)
NAMED INSURED (TRADE SUBCONTRACTOR):
Apex Mechanical & Clean Energy Solutions, LLC
4850 Industrial Parkway, Suite 300, Dallas, TX 75201 β€’ State License: TACLA-884920E
LTR TYPE OF INSURANCE ADDL INSR WVD SUBR POLICY NUMBER POLICY EFF (MM/DD/YYYY) POLICY EXP (MM/DD/YYYY) LIMITS
A COMMERCIAL GENERAL LIABILITY
[X] Commercial General Liability
[X] Occurrence Basis
GEN'L AGGREGATE LIMIT APPLIES PER:
[X] PROJECT [ ] POLICY [ ] LOC
Y Y GL-984102-TX 01/01/2026 01/01/2027 EACH OCCURRENCE: $1,000,000
DAMAGE TO RENTED: $300,000
MED EXP (Any person): $10,000
PERSONAL & ADV INJ: $1,000,000
GENERAL AGGREGATE: $2,000,000
PRODUCTS-COMP/OP AGG: $2,000,000
B AUTOMOBILE LIABILITY
[X] Any Auto
[X] All Owned, Hired & Non-Owned Autos
Y Y CA-481902-TX 01/01/2026 01/01/2027 COMBINED SINGLE LIMIT (Ea accident): $1,000,000
C UMBRELLA / EXCESS LIABILITY
[X] Occurrence Basis
[X] Following Form CGL / Auto / WC
Retention / Deductible: $10,000
Y Y UL-771920-TX 01/01/2026 01/01/2027 EACH OCCURRENCE: $5,000,000
AGGREGATE: $5,000,000
D WORKERS COMPENSATION & EMPLOYERS' LIABILITY
[X] WC Statutory Limits (Texas)
Officers / Principals Excluded? [ ] Yes [X] No
N/A Y WC-552910-TX 01/01/2026 01/01/2027 E.L. EACH ACCIDENT: $1,000,000
E.L. DISEASE - EA EMPL: $1,000,000
E.L. DISEASE - POLICY: $1,000,000
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES / SPECIAL PROVISIONS (Mandatory Contractual Endorsement Language):
PROJECT: All Commercial Construction Operations, Installation & Retrofit Works of the Named Insured.

General Contractor, Project Owner, and their parent corporations, subsidiaries, officers, directors, and employees are named as ADDITIONAL INSUREDS on a PRIMARY AND NON-CONTRIBUTORY basis with respect to General Liability (ISO forms CG 20 10 04 13 for ongoing operations and CG 20 37 04 13 for completed operations, or manuscript equivalent) and Automobile Liability.

A WAIVER OF SUBROGATION applies in favor of the Additional Insureds on General Liability (CG 24 04), Automobile Liability (CA 04 44), and Workers' Compensation (WC 00 03 13) where permitted by applicable state law and required by written contract executed prior to loss.

NOTICE OF CANCELLATION: Thirty (30) days advance written notice of cancellation, non-renewal, or material change shall be delivered to Certificate Holder (10 days for non-payment of premium).
CERTIFICATE HOLDER:
Turner Construction Company / Project Owner
Attn: Subcontract Risk & Compliance Dept
2001 Ross Avenue, Suite 2400, Dallas, TX 75201
Email: dallas.compliance@tcco.com
AUTHORIZED REPRESENTATIVE:
Marcus Sterling, CIC, CRM
AUTHORIZED INSURANCE BROKER SIGNATURE
ACORD 25 (2016/03). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
AIA & AGC Standard Joint Check Agreement Tripartite Material Supplier & Subcontractor Payment Authorization

Joint Check Agreement & Vendor Payment Authorization

Standard Form Approved for Commercial Subcontracts & Second-Tier Material Suppliers
AGREEMENT NO: JCA-2026-9941 • DATE: September 14, 2026
This Joint Check Agreement is entered into by and among the following three parties:
1. General Contractor:
Turner Construction Company
2001 Ross Ave, Suite 2400
Dallas, TX 75201
2. Subcontractor:
Apex Mechanical & Clean Energy
4850 Industrial Pkwy, Ste 300
Dallas, TX 75201
3. Material Supplier:
Daikin Applied Americas, Inc.
13600 Industrial Blvd
Minneapolis, MN 55441
1. Project & Subcontract Identification
PROJECT NAME: Trinity Technology Tower Decarbonization
PROJECT LOCATION: 2400 Trinity Blvd, Dallas, TX
PROJECT OWNER: Trinity Gateway Properties, LLC
SUBCONTRACT NUMBER: SUB-TCCO-2025-8849
2. Material Supplier Purchase Order Schedule
Supplier agrees to furnish, and Subcontractor agrees to purchase, the specialized MEP/Clean Tech equipment described below:
PO Number Item / Equipment Description Delivery Schedule Net Purchase Sum
PO-APEX-8849-01 2x Daikin Magnetic Bearing Chillers (600 Tons Total) Oct 15, 2026 $485,000.00
PO-APEX-8849-02 4x Greenheck Total Enthalpy DOAS Make-Up Air Units Nov 01, 2026 $210,000.00
TOTAL AUTHORIZED JOINT CHECK SUM: $695,000.00
3. Joint Check Operating Covenants & Lien Releases
1. PAYMENT AUTHORIZATION: Subcontractor hereby irrevocably authorizes and requests General Contractor to draw checks payable jointly to Subcontractor AND Material Supplier for all approved invoices covering materials delivered to the Project.

2. ENDORSEMENT & NEGOTIATION: Subcontractor covenants that upon receipt of any joint check, it shall immediately endorse the check without restriction and deliver it directly to Material Supplier. Supplier shall apply check proceeds to the specific PO invoices above.

3. LIEN WAIVER UPON CLEARANCE: Material Supplier agrees that endorsement, deposit, and final collection of each joint check constitutes an unconditional release and waiver of mechanics' lien, stop notice, and payment bond rights against Owner, Project, and General Contractor to the exact extent of funds received.

4. LIMITATION OF LIABILITY: General Contractor does not assume direct contractual liability to Supplier. GC's payment obligation is strictly contingent upon Subcontractor's performance and funds earned and payable under the Prime Subcontract.
4. Authorized Tripartite Execution
GENERAL CONTRACTOR:
Dave Sterling
Dave Sterling, Vice President
Turner Construction Company
Date: 09/14/2026
SUBCONTRACTOR:
Jeffrey T. Sterling
Jeffrey T. Sterling, President
Apex Mechanical & Clean Energy
Date: 09/14/2026
MATERIAL SUPPLIER:
Karen Lindqvist
Karen Lindqvist, VP Credit
Daikin Applied Americas, Inc.
Date: 09/14/2026
AIA Document G712β„’ Standard Transmittal Shop Drawing & Material Submittal Record

Submittal Transmittal & Shop Drawing Review

AIA Document G712β„’ / CSI MasterFormat Standard Submittal Record
SUBMITTAL NO: 23-6426-SUB-01 • REV: 0 (ORIGINAL) • DATE: September 14, 2026
TRANSMITTED TO:
Turner Construction Company (Attn: Project Eng)
Smith & Associates Consulting Engineers (EOR)
2001 Ross Avenue, Dallas, TX
TRANSMITTED FROM (TRADE CONTRACTOR):
Apex Mechanical & Clean Energy Solutions, LLC
4850 Industrial Parkway, Suite 300, Dallas, TX
Project Mgr: Marcus Vance, PE
PROJECT: Trinity Technology Tower Modernization
CSI SPEC SECTION: 23 64 26 - Water Chiller-Heaters
DRAWING REF: M-501, M-502 Central Plant Schematics
1. Schedule of Transmitted Submittal Items
Item # Copies / Format Manufacturer / Author Description of Drawing, Product Data or Sample
01 1x Electronic PDF Multistack / Carrier Product Data: 400-Ton 4-Pipe Simultaneous Heat Recovery Chiller-Heater Cut Sheets
02 1x Electronic PDF Apex Engineering Shop Drawing: Equipment Pad Dimension, Inertia Base & Seismic Spring Isolator Details
03 1x Electronic PDF Tridium Niagara N4 Controls Submittal: BACnet/IP Points List, Sequences & Wiring Diagrams
2. Subcontractor Certification & EOR Review Stamp
Trade Contractor Review Stamp
The undersigned contractor certifies that all field dimensions, product criteria, materials, and specification compliance have been verified and coordinated with all trades.
REVIEWED & APPROVED BY:
Marcus Vance
Marcus Vance, PE • Project Engineer
Date: 09/14/2026
Engineer of Record (EOR) Action Stamp
[X] APPROVED
[ ] APPROVED AS NOTED
[ ] REVISE & RESUBMIT
[ ] REJECTED
Review is only for general conformance with the design concept of the project and contract documents.
REVIEWED BY: R. J. Sterling, PE (Smith & Assoc)
Date: 09/14/2026
AIA Document G703β„’ Standard Continuation Sheet Schedule of Values (SOV) & Itemized Pay Application Breakdown

Continuation Sheet (Schedule of Values)

AIA Document G703β„’ • Companion Instrument to Application and Certificate for Payment (AIA G702β„’)
APPLICATION NO: 04
PERIOD TO: September 14, 2026
PROJECT NO: TCCO-2025-8849
PROJECT: Trinity Technology Tower Decarb
GENERAL CONTRACTOR: Turner Construction Company
TRADE CONTRACTOR: Apex Mechanical Solutions
A
ITEM
B
DESCRIPTION OF WORK
C
SCHEDULED VALUE
D
WORK PREV COMPLETED
E
WORK THIS PERIOD
F
STORED MATERIALS
G
TOTAL COMPL & STORED (D+E+F)
H
% (G/C)
I
BALANCE TO FINISH (C-G)
J
RETAINAGE (10%)
01 Mobilization, Submittals & Engineering $45,000.00 $45,000.00 $0.00 $0.00 $45,000.00 100% $0.00 $4,500.00
02 Modular Air-to-Water Heat Pump Chillers $315,000.00 $180,000.00 $85,000.00 $30,000.00 $295,000.00 93.7% $20,000.00 $29,500.00
03 Hydronic CHW/HHW Piping & Insulation $95,000.00 $45,000.00 $30,000.00 $0.00 $75,000.00 78.9% $20,000.00 $7,500.00
04 Dedicated Outdoor Air DOAS & DCKV Hoods $145,000.00 $70,000.00 $50,000.00 $10,000.00 $130,000.00 89.7% $15,000.00 $13,000.00
05 Building Automation DDC & Niagara N4 $85,000.00 $35,000.00 $30,000.00 $0.00 $65,000.00 76.5% $20,000.00 $6,500.00
06 Testing, Adjusting, Balancing & Cx $35,000.00 $0.00 $15,000.00 $0.00 $15,000.00 42.9% $20,000.00 $1,500.00
GRAND TOTALS: $720,000.00 $375,000.00 $210,000.00 $40,000.00 $625,000.00 86.8% $95,000.00 $62,500.00
CONTRACTOR CERTIFICATION:
Jeffrey T. Sterling
Jeffrey T. Sterling, President • Apex Mechanical
Date: 09/14/2026
ARCHITECT / EOR PAYMENT CERTIFICATION:
R. J. Sterling
R. J. Sterling, PE • Smith & Associates Engineers
Amount Certified: $189,000.00 (Net of Retainage)
AIA A201β„’ & AGC LEAN CONSTRUCTION STANDARD

πŸ“… ROLLING 3-WEEK FIELD LOOKAHEAD SCHEDULE

Project Name & Phase
Metro Innovation District Hub Phase 2
Three-Week Window
Sept 14, 2026 – Oct 02, 2026
General Superintendent
Frank Gallagher (GC Superintendent)
Weather / Schedule Buffer
2 Rain Contingency Days Tracked
CSI / Activity Description Subcontractor Trade Crew Location Week 1 (09/14 - 09/18) Week 2 (09/21 - 09/25) Week 3 (09/28 - 10/02) % Done
MTWTF MTWTF MTWTF
Div 22: Underground Sanitary & Hydrostatic Test Apex Mechanical 4 Level 1 Slab ● ● ● ● βœ“ 100%
Div 26: Main Switchboard Conduits & Feeders VoltEdge Electric 6 Main Elec Vault ● ● ● ● ● ● ● ● βœ“ 85%
Div 23: Overhead Medium Pressure Duct Mains Titan HVAC Systems 5 Level 2 Plenum ● ● ● ● ● ● ● ● ● ● ● ● βœ“ 70%
Div 09: Light Gauge Metal Stud Framing & Top Track Pinnacle Drywall 8 Level 2 Partitions ● ● ● ● ● ● ● ● ● ● 45%
Div 21: Fire Sprinkler Branch Drops & Test BlazeStop Fire Protection 3 Level 2 South Wing ● ● ● ● ● ● ● βœ“ 60%
Div 14: Elevator 1 & 2 Guide Rail Alignment Ascent Elevator Group 4 Elevator Shafts 1-2 ● ● ● ● ● 25%
πŸ—οΈ Material Hoist & Crane Hook Windows
  • Mon 09/14 (07:00 - 11:00): AHU / Chiller Roof Rigging (Titan HVAC)
  • Wed 09/23 (08:00 - 13:00): Metal Stud & Sheetrock Stocking (Pinnacle)
  • Fri 10/02 (12:00 - 16:00): Switchgear Heavy Transformers (VoltEdge)
πŸ“‹ Mandatory AHJ & Special Inspection Hold Points
  • Hold Point 1: City Underground Plumbing Hydrostatic Test (Passed 09/18)
  • Hold Point 2: In-Wall Electrical & Medical Gas Rough-In (Scheduled 09/25)
  • Hold Point 3: Pre-Drywall Overhead Ceiling Concealment Inspection (10/01)
General Superintendent Commitment
Frank Gallagher
Frank Gallagher • Lead Project Superintendent
AIA / AGC Lean Last Planner Commitment Verified • 09/14/2026
Subcontractor Trade Council Acceptance
Marcus Vance
Marcus Vance • Subcontractor Foreman Representative
All MEP / Finishes Trades Concur with Lookahead Milestones
AIA DOCUMENT G707β„’ STANDARD INSTRUMENT

πŸ›οΈ CONSENT OF SURETY TO FINAL PAYMENT

Surety Bond Number
PB-88921-A312
Bond Penal Sum
$1,250,000.00 (100% Contract)
Execution Date
September 14, 2026
TO OWNER / OBLIGEE:
Metro Development Authority & Prime Builders LLC
100 Corporate Parkway, Suite 400, Indianapolis, IN 46204
PROJECT:
Metro Innovation District Hub Phase 2 (Central Thermal Plant & Mechanical Subcontract)
CONTRACTOR / PRINCIPAL:
Apex Mechanical & Piping Contractors Inc., 450 Enterprise Way, Indianapolis, IN

In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the:

TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA (Hartford, CT)

on bond of Apex Mechanical & Piping Contractors Inc., Contractor, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to Metro Development Authority & Prime Builders LLC, Owner, as set forth in the said Surety Company's bond.

The Surety confirms that all sub-subcontractors, labor forces, and material suppliers have delivered final lien waivers or that acceptable escrow guarantees have been verified.

Attest / Corporate Officer
Eleanor Vance
Eleanor Vance • Assistant Secretary
Affixed Corporate Seal of Surety • 09/14/2026
Surety Company Attorney-In-Fact
Jonathan R. Sterling
Jonathan R. Sterling • Attorney-in-Fact
Power of Attorney Attached & Validated
AIA DOCUMENT G709β„’ STANDARD INSTRUMENT

πŸ“‹ WORK CHANGES PROPOSAL REQUEST / RFQ

Subcontractor Scope Modification β€’ Itemized Cost Breakdown β€’ Contract Time Impact Sheet

Part 1: Description of Proposed Scope Change (Attach Sketches / Bulletins)

Please submit an itemized quotation for changes in the Contract Sum and Contract Time resulting from the proposed modifications described below. THIS IS NOT A CHANGE ORDER OR DIRECTIVE TO COMMENCE WORK.

Part 2: Subcontractor Itemized Cost Breakdown Schedule AIA G709 Compliance
Journeyman & apprentice field hours
Pipe, fittings, valves, insulation
Scissor lift, pipe groover, hoist
Specialty pipe insulation contractor
Standard allowable contract markup
Subcontractor payment & performance bond
Calendar days extension requested
Direct Cost Subtotal: $24,050.00
Markup + Bond: $2,825.88 | Time: 4 Calendar Days
Total Proposed Contract Sum Adjustment: $26,875.88
Part 3: Authorization & Subcontractor Representation
Request Initiated By (Architect / GC):

Issued for price breakdown and scheduling review only.

William H. Vance, AIA / Turner Construction
Architect / Project Manager Signature
Quotation Submitted By (Subcontractor):

Pricing valid for 30 calendar days from submission date.

Gregory Thorne, Vice President of Estimating
Authorized Subcontractor Representative
βš–οΈ AIA Document G709β„’ Standard Work Changes Proposal Request Standard β€’ Legally Enforceable Breakdown
AIA DOCUMENT G714β„’ STANDARD INSTRUMENT

⚑ CONSTRUCTION CHANGE DIRECTIVE (CCD)

Binding Owner/Architect Work Order Prior to Change Order Agreement β€’ AIA A201β„’ Β§7.3

Part 1: Directive to Proceed With Change in the Work (AIA Document A201β„’ Β§7.3)

YOU ARE HEREBY DIRECTED TO MAKE THE FOLLOWING CHANGE(S) IN THIS CONTRACT AND PROCEED IMMEDIATELY WITH THE WORK.

Part 2: Basis of Determining Adjustment in Contract Sum & Schedule Binding Directive
Maximum initial billing authorization
Overhead & profit on direct costs
Calendar days extension authorized
Directive Authorization Status: PROCEED IMMEDIATELY
Daily work tickets & certified payroll must be signed daily by Project Superintendent.
Authorized Not-to-Exceed (NTE) Cap: $42,500.00
Part 3: Binding Signatures & Subcontractor Acknowledgment
Architect / Engineer:

Certifies change is justified and compliant with design.

Nathaniel Drake, AIA
Signature & Date: Sep 14, 2026
Owner Authorization:

Authorizes immediate funding and schedule adjustment.

Elena Fisher, VP Development
Signature & Date: Sep 14, 2026
Contractor Receipt:

Receipt acknowledged; work proceeding under directive.

Gregory Thorne, Vice President
Signature & Date: Sep 14, 2026
βš–οΈ AIA Document G714β„’ Standard Construction Change Directive β€’ Converts to G701β„’ Change Order Upon Audit
AIA DOCUMENT G704β„’ STANDARD INSTRUMENT

πŸ“œ CERTIFICATE OF SUBSTANTIAL COMPLETION

Legal Transfer of Occupancy β€’ Punch List Sizing β€’ Warranty & Retainage Release Trigger

Part 1: Architect's Certification of Substantial Completion

The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief, to be substantially complete. Substantial Completion is the stage in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use.

Part 2: Punch List Completion Schedule & Retainage Reduction AIA G704 Compliance
Retainage Released to Contractor: $138,750.00
Retainage reduced from $185,000 to $46,250. Punch list completion deadline: 30 calendar days.
Remaining Retained Balance: $46,250.00
Part 3: Tripartite Substantial Completion Signatures
Architect / Engineer:

Certifies work is substantially complete per specifications.

Jonathan Miller, AIA
Signature & Date: Sep 14, 2026
Contractor Acceptance:

Agrees to complete attached punch list within 30 days.

Gregory Thorne, Vice President
Signature & Date: Sep 14, 2026
Owner Occupancy Acceptance:

Accepts occupancy and assumes utility & insurance responsibility.

Sarah Jenkins, Director of Facilities
Signature & Date: Sep 14, 2026
βš–οΈ AIA Document G704β„’ Standard Certificate of Substantial Completion β€’ 1-Year Warranty Commences Today
AIA DOCUMENT G706Aβ„’ STANDARD INSTRUMENT

πŸ›‘οΈ CONTRACTOR'S AFFIDAVIT OF RELEASE OF LIENS

Companion to AIA G706β„’ β€’ Final Subcontractor & Material Supplier Lien Waivers β€’ Title Indemnity

Part 1: Sworn Affidavit of Contractor's Release of Liens (AIA A201β„’ Β§9.10.2)

The undersigned hereby certifies that to the best of the undersigned's knowledge, information and belief, the Releases or Waivers of Lien attached hereto include all the Work, materials, equipment, and labor for which Payment has been applied for, and covers all subcontractors, laborers, material suppliers, and equipment rental companies who have or might have liens against any property of the Owner arising out of the performance of this Contract.

The Contractor further agrees to indemnify and hold harmless the Owner and Architect from any and all mechanic's liens, stop notices, or claims arising from labor, services, or materials provided under this Contract.

Part 2: Schedule of Attached Subcontractor & Vendor Final Lien Waivers Zero Encumbrances Verified
Trade / Vendor Entity Scope / Materials Furnished Final Paid Amount Waiver Status
Precision Pipe Insulation LLC Hydronic line acoustic & thermal insulation $142,500.00 βœ“ Unconditional Final
Midwest Valve & Fitting Supply Victaulic grooved valves & 10" pipe fittings $218,450.00 βœ“ Unconditional Final
Crane & Rigging Logistics Corp 300-ton crane hoisting & chiller setting $64,800.00 βœ“ Unconditional Final
Automated Controls Engineering BACnet DDC sensors & VFD wiring $96,200.00 βœ“ Unconditional Final
Exceptions to Release of Liens: None. All subcontractors, laborers, and materialmen have received full and final payment with zero outstanding claims, retainage disputes, or backcharges.
Part 3: Sworn Corporate Execution & Notary Public Jurat
Contractor Authorized Officer:

Subscribed and sworn to before me under penalty of perjury.

Gregory Thorne, Vice President
Corporate Officer Signature | Sep 14, 2026
Notary Public Acknowledgement:

State of Indiana, County of Marion. Subscribed on Sep 14, 2026.

Amanda R. Sterling, Notary Public
Commission #NP-748102 | My Commission Expires: Oct 30, 2029
βš–οΈ AIA Document G706Aβ„’ Standard Contractor's Affidavit of Release of Liens β€’ Required For Final Retainage Release
AIA DOCUMENT G802β„’ STANDARD INSTRUMENT

πŸ“ AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT

Architect / Engineer Scope Expansion β€’ Additional Clean Tech Engineering Fees β€’ Schedule Adjustment

Part 1: Description of Additional Professional Services & Scope Modifications

The Agreement between Owner and Architect is hereby amended to incorporate the following additional engineering and consulting services:

Part 2: Professional Compensation & Milestone Schedule Adjustment AIA G802 Compliance
Professional Fee Adjustment: +$42,500.00
Schedule milestone completion date extended by 21 calendar days.
New Revised Agreement Sum: $776,500.00
Part 3: Dual-Party Agreement & Authorization
Architect / Engineer Acceptance:

Agrees to provide amended scope per revised terms.

Jonathan Miller, PE / Syska Hennessy
Principal Engineer Signature | Sep 14, 2026
Owner Authorization:

Authorizes professional fee adjustment and schedule extension.

Elena Fisher, VP Development
Owner Representative Signature | Sep 14, 2026
βš–οΈ AIA Document G802β„’ Standard Amendment to Professional Services Agreement β€’ Legally Binding Contract Modification
AIA DOCUMENT G701Sβ„’ STANDARD SUB-AGREEMENT MODIFICATION

πŸ“‘ SUBCONTRACT CHANGE ORDER (AIA G701S)

Subcontractor Scope Adjustment β€’ Authorized Price Adjustment β€’ Revised Subcontract Sum & Schedule

Part 1: Description of Subcontract Work Changes & Modifications

The Subcontract Agreement between Prime Contractor and Subcontractor is hereby amended as follows:

Part 2: Subcontract Sum & Schedule Adjustment Accounting AIA G701S Compliance
Original Subcontract Sum:

Initial executed subcontract agreement amount

Net Change by Previously Authorized Subcontract Change Orders:

Cumulative sum of previous Subcontract Change Orders #01 through #02

Subcontract Sum Prior to this Change Order:
$358,500.00
Subcontract Sum will be (Increased) / (Decreased) by this Change Order:

Net amount added to or deducted from subcontract

New Subcontract Sum Including this Change Order:
$386,350.00
Subcontract Time / Schedule Adjustment:

Number of calendar days added to or subtracted from subcontract completion date

Part 3: Mutual Execution & Binding Signatures (AIA G701S)

When signed by Prime Contractor and Subcontractor, this document becomes an amendment to the Subcontract and the Subcontractor shall proceed promptly with the Work.

SUBCONTRACTOR: Solstice Commercial Renewables LLC
Raymond Ortiz, VP Operations
Authorized Signature Date: Sep 14, 2026
PRIME CONTRACTOR: Vanguard Builders Commercial LLC
David H. Sterling, Project Executive
Authorized Signature Date: Sep 14, 2026
AIA Document G701Sβ„’ Subcontract Change Order • Official Standard Subcontract Instrument
AIA DOCUMENT G703β„’ STANDARD CONTINUATION INSTRUMENT

πŸ“Š CONTINUATION SHEET (SCHEDULE OF VALUES)

Breakdown of Work Completed & Stored to Date β€’ CSI Division Line Items β€’ AIA G702 Pay App Attachment

Schedule of Values & Progress Billings Breakdown AIA G703 Standard Format
Item (A) Description of Work (B) Scheduled Value (C) Previous Work (D) This Period (E) Stored Mats (F) Total Done (G) % (H) Balance to Finish (I)
01 Mobilization, Structural Foundation & Vibration Pads $75,000.00 $75,000.00 $0.00 $0.00 $75,000.00 100% $0.00
02 500 kW Microturbine Skid Delivery & Rigging $680,000.00 $544,000.00 $136,000.00 $0.00 $680,000.00 100% $0.00
03 Heat Recovery Steam Generator (HRSG) & Flue Gas Ducting $320,000.00 $160,000.00 $96,000.00 $24,000.00 $280,000.00 87.5% $40,000.00
04 Electrical 480V Interconnection, Switchgear & Net Metering $185,000.00 $92,500.00 $55,500.00 $10,000.00 $158,000.00 85.4% $27,000.00
05 High-Pressure Gas Train, Booster Compressor & Controls $140,000.00 $70,000.00 $42,000.00 $0.00 $112,000.00 80.0% $28,000.00
TOTALS (CSI DIVISIONS 01-48): $1,400,000.00 $941,500.00 $329,500.00 $34,000.00 $1,305,000.00 93.2% $95,000.00
Retainage Rate (Standard 5% or 10%):
Total Retainage Withheld (Col G × %):
$130,500.00
Total Earned Less Retainage:
$1,174,500.00
Current Payment Due this Period:
$296,550.00
Part 3: Pay Application Certification & Signatures (AIA G702 / G703)
CONTRACTOR / CERTIFIED BY:
Edward Sterling, Project Executive
Authorized Signature Date: Sep 14, 2026
ARCHITECT / ENGINEER CERTIFICATE FOR PAYMENT:
Syska Hennessy Group / Smith & Miller Architects
Architect's Signature Date: Sep 14, 2026
AIA Document G703β„’ Continuation Sheet • Official Standard Pay Application Instrument
AIA DOCUMENT G707Aβ„’ BOND SURETY INSTRUMENT

πŸ›‘οΈ CONSENT OF SURETY TO REDUCTION IN RETAINAGE

Surety Bond Authorization • Retainage Reduction / Partial Release • Preservation of Performance Bond Obligations

Part 1: Formal Surety Consent & Legal Undertaking (AIA G707A)

The Surety, on bond of the Contractor listed above, hereby approves of the reduction in or partial release of retainage to the Contractor as set forth below, and agrees that such reduction or release of retainage shall not relieve the Surety of any of its obligations to the Owner as set forth in said Surety Bond.

This consent is issued pursuant to AIA Document G707Aβ„’ and leaves in full force and effect all conditions and covenants of the existing Performance Bond and Labor and Material Payment Bond.

Part 2: Retainage Reduction Schedule & Cash Flow Accounting AIA G707A Terms
Total Contract Sum to Date:

Original contract plus approved change orders

Prior Cumulative Retainage Withheld (10%):

Total retainage withheld from previous pay applications

Authorized Retainage Reduction / Release Amount:

Net retainage dollars authorized to be disbursed to Contractor

Remaining Retainage Balance Withheld (5%):

Continuing retainage held by Owner pending Final Completion

$70,000.00
Part 3: Surety Execution & Power of Attorney Attestation (AIA G707A)

In witness whereof, the Surety has hereunto set its hand and seal this 15th day of September, 2026. Certified copy of Attorney-in-Fact Power of Attorney attached hereto.

SURETY: Travelers Casualty and Surety Co
Sarah M. Pennington, Attorney-in-Fact
Corporate Seal Affixed Date: Sep 15, 2026
CONTRACTOR ACKNOWLEDGMENT: Vanguard Builders LLC
David H. Sterling, Lead Principal
Authorized Officer Date: Sep 15, 2026
AIA Document G707Aβ„’ Consent of Surety to Reduction of Retainage • Official Standard Instrument
FORM TV-FORM-BL2026 • OFFICIAL SUBCONTRACTOR BID INSTRUMENT

πŸ“‘ COMMERCIAL SUBCONTRACT BID PROPOSAL & SCOPE LETTER

Defensible Lump-Sum Breakdown • Embedded 7 Change Order Shield Clauses • CSI MasterFormat

License: Tel: Email:
PROPOSAL REF:
TV-2026-BL-7704
Standard AIA/AGC Format
We hereby submit our formal lump-sum subcontractor bid proposal for furnishing all necessary labor, statutory fringe benefits, materials, specialized tooling, layout, and supervision required to complete the trade scope detailed herein, in accordance with project drawings, specifications, and addenda, subject to the explicit scope qualifications and protective Change Order Shield conditions set forth below:
Section 1: Lump Sum Base Bid Financial Proposal AIA G702 / G703 Matching Basis
TOTAL LUMP SUM BASE BID AMOUNT:
(Excluding Owner Controlled Insurance Program / OCIP deductibles if applicable)
BURDENED LABOR (45%): $26,154.23
MATERIALS & EQUIP (40%): $23,248.21
OVERHEAD & PROFIT (15%): $8,718.08
10% RETAINAGE HELD: $5,812.05
βœ“ Section 2: Work Scope Inclusions
βœ— Section 3: Scope Exclusions & Clarifications
Section 4: Mandatory Change Order Shield Protective Riders Doc TV-DOC-PB2026 Legal Clauses

1. Unforeseen & Concealed Conditions: If physical site conditions differ materially from contract drawings or represent latent subsurface anomalies, Subcontractor shall provide written notice within 48 hours. Contract sum and completion schedule shall be equitably adjusted via Change Order prior to proceeding.

2. Delay, Suspension & Acceleration Compensation: Subcontractor is entitled to equitable extension of time and financial recovery for extended jobsite general conditions, field supervision, and demobilization costs caused by GC delays, trade out-of-sequence pacing, or project owner suspensions exceeding 5 calendar days.

3. Strict 7-Day Written Directive Prerequisite: No extra work, design deviation, or scope alteration shall be performed without a prior written Change Order (AIA G701) or Construction Change Directive (AIA G714) signed by GC. Verbal field instructions shall not bind Subcontractor to uncompensated labor.

4. Prompt 30-Day Pay-When-Paid Statutory Backstop: Progress payments must be remitted to Subcontractor within statutory deadlines or 30 days of invoice. "Pay-when-paid" clauses shall act solely as a reasonable timing mechanism and never as a condition precedent to absolute payment obligation.

5. Overlapping Trade Interference & Site Readiness: GC shall provide clear, unencumbered access to work areas with substrates verified in tolerance. Cumulative trade stacking, workspace crowding, or pacing interference shall entitle Subcontractor to documented productivity loss compensation.

6. Material Price Volatility Escalation (>5%): In the event verified trade commodity prices (copper, steel, PVC, roofing asphalt/insulation) increase more than 5% between bid date and purchase commitment, contract sum shall be adjusted to reflect documented net difference without markup penalty.

7. Mutual Waiver of Consequential & Liquidated Damages: Neither party shall be liable for indirect, incidental, or consequential damages (including business loss or financing costs). Subcontractor shall not be assessed prime contract liquidated damages unless delays are exclusively caused by Subcontractor fault.

Section 5: Hourly Labor Rates for Authorized Additional Work (T&M Basis)
TRADE FOREMAN:
JOURNEYMAN:
APPRENTICE:
T&M MATERIAL MARKUP:
Section 6: Formal Proposal Authorization & General Contractor Acceptance

Acceptance of Proposal: The specifications, financial terms, and protective conditions enumerated herein are satisfactory and accepted. General Contractor authorizes Subcontractor to execute work as specified upon execution of standard subcontract agreement incorporating these terms.

SUBMITTED BY (SUBCONTRACTOR):
Michael R. Vance, Chief Estimator
Authorized Signature Date: Oct 4, 2026
ACCEPTED & CONFIRMED (GENERAL CONTRACTOR):
(Authorized Officer / Preconstruction Director Signature)
Print Name: _______________________ Date: ____________
ToolsVault Institutional Preconstruction Suite • Document TV-FORM-BL2026