LETTER OF TRANSMITTAL / SUBMITTAL PACKAGE
Submittal Schedule of Items & Lead-Time Matrix
Detailed itemization of drawings, cut sheets, samples, and design team review status.
| Submittal # | Spec Section | Description / Item Title | Type | Copies | Lead Time | Date Needed | A/E Review Action | Act |
|---|
Critical Path Procurement & Lead-Time Analysis
FABRICATION RADAREquipment lead times exceeding 10 weeks must be prioritized for expedited Architect/Engineer stamp to prevent liquidated damages under General Conditions Article 8.
"The undersigned Contractor hereby certifies that the submittals referenced herein have been checked and verified for field measurements, construction criteria, physical dimensions, materials, catalog numbers, and full compliance with the Contract Documents, Specifications, and Drawings, except as explicitly noted."
Claim Your Trade County
Lock out your regional competitors. Receive exclusive inbound commercial GC project RFQs and high-volume submittal / bid opportunities.
Subcontractor Estimating Suite
Instant download access to all 6 CSI Division Excel estimating workbooks, automated AIA G702/G703 SOV rollups, Davis-Bacon spreadsheets, and safety logs.
AIA G702 / G703 Generator
Generate your monthly Progress Billing Certificate and Schedule of Values continuation sheet with live 10% retainage escrow tracking.