❄️ 1. Chilled Plant & Cooling Load
⚡ 2. Electric Tariff & Demand Ratchets
🏛️ 3. CapEx & IRA Section 48 ITC
Capital saved by procuring a smaller chiller compressor plant due to load-leveling.
TES Tank Capacity
1,800 Ton-Hrs
9 Modular Ice Tanks
Net Turnkey CapEx
$58,800
After Chiller Downsize Credit
Annual Utility Savings
$48,720/yr
1.2 Yrs Simple Payback
15-Minute Peak Demand Shaving Performance 240 kW Peak Shaved
Baseline Conventional Chiller Load
400 kW Demand
With Thermal Ice Storage Discharge
160 kW Demand (60% Cut)
Turnkey TES Equipment & Chiller Downsizing Pro Forma
| Scope / Line Item | Metric Quantity | Unit Rate | Amount ($) |
|---|
20-Year Cumulative Operating Value
$1,124,000 Net SavingsAssumes 3.0%/yr electric tariff escalation. Closed-circuit glycol loop prevents coil fouling, and polyethylene ice tanks require virtually zero mechanical maintenance over a 30-year operational life.