Commercial Utility Ground Lease Protocol

Commercial RV Dump Station Ground Lease & Sanitary Protocol

🛣️ Concrete Pad Civil Geometry & Containment Apron

  • ✅ 12ft x 45ft Concrete Slab: Heavy 6" wire-mesh reinforced 4,000 PSI concrete drive-thru apron.
  • ✅ 1/4" Per Foot Slope to Center: Slab pitches inward to stainless steel drain basin to contain all wash water.
  • ✅ Curbed Island Bollards: 6" concrete-filled yellow steel pipe bollards protect water towers and pay kiosks.

💧 RPZ Backflow Prevention & Potable Isolation

  • ✅ Reduced Pressure Zone (RPZ): ASSE 1013 certified RPZ valve isolates municipal potable drinking line.
  • ✅ Non-Potable Rinse Tower: Tower marked with red high-visibility "NON-POTABLE / RINSE ONLY" warnings.
  • ✅ Physical Separation: Potable drinking water fill tower placed minimum 25ft away from sewer dump basin hatch.

⚡ Cashless Automation & Grinder Stations

  • ⚠️ Automated Barrier Gate: Cashless credit card / Apple Pay kiosk activates drop gate & unlocks hatch for 15 mins.
  • ⚠️ Duplex Sewage Grinder: 2.0 HP stainless cutter pumps automatically pulse upon waste detection.
  • ✅ Enzyme Wash-Down Cycle: Automated wash nozzle sprays biological odor-eating enzymes after each dump.

📜 Host Ground Lease & Environmental Indemnity

  • 💎 $1M Environmental Pollution Policy: Operator maintains strict pollution insurance indemnifying property owner.
  • 💎 Monthly Ground Rent Split: Host receives $750–$1,500/mo flat rent or 20% gross revenue share.
  • 💎 24/7 Remote Monitoring: High-definition pan-tilt-zoom CCTV cameras record license plates and detect spill events.